Bring a drawing or bring a target price — we have the tooling, the supply chain and the export paperwork to get it into a container.
You send the drawing, 3D file or a physical sample. We build tooling, produce a golden sample, and manufacture to your specification under your brand.
Pick a platform from our catalog and we modify motor output, blade span, light engine, finish and control to hit your price point and market.
Your logo on the fixture, remote, manual and carton. We keep the tooling and the paperwork so reorders are fast.
Timelines below assume an existing tooling platform. A brand-new housing or blade profile
adds 15–25 days for tooling and first-article approval.
Send target market, quantity, reference product or drawing. We confirm feasibility and flag certification implications within one business day.
Unit price, MOQ, tooling cost, lead time (within China), packing details and payment terms.
Working sample in 7–15 days for existing tooling; 15–25 days extra if new tooling is needed.
You test the sample, we revise if needed. Golden sample is signed off for mass production.
25–35 days after deposit and sample approval, depending on model mix and finishing.
Final AQL inspection, photo report, third-party inspection on request, then FOB or EXW shipment.
Sample: 7–15 days (existing tooling) | Mass production: 25–35 days |
New tooling: +15–25 days | Peak season (Aug–Oct) may add a week.
| Item | Options |
|---|---|
| Blade span and count | 36″ / 42″ / 48″ / 52″ / 56″ / 60″ — 3, 4 or 5 blades. |
| Motor platform | AC or DC brushless; power draw, speed steps and airflow tuned to target CFM. |
| Light engine | Wattage, lumen output, CCT range, CRI and dimming protocol. |
| Finish | Powder coat, painting, plating, wood grain print — matched to a sample or Pantone. |
| Control | Pull chain, wall switch, RF remote, Wi-Fi or BLE module. |
| Smart ecosystem | Tuya / Smart Life, Alexa, Google Home, or your own white-label app. |
| Packaging | Plain export carton, retail color box, or display packaging with your artwork. |
| Documentation | Manual, spec sheet, barcode/UPC, carton marks, compliance declarations. |
You will get a faster, more accurate quotation if your first email includes these. If you
do not have all of them yet, send what you have — we will fill the gaps with you.
Tooling built for your program is not used for other customers. We sign NDAs on
request, and we do not sell a customer’s proprietary design to anyone else.
Typical terms are 30% deposit with balance against copy of bill of lading.
FOB Zhongshan or EXW. Payment terms for repeat programs are negotiable.
These are the four failure points we see most often on custom fan light programmes. Each one is
cheaper to prevent at the sample stage than to fix after mass production.
The motor, the driver and the insulation class decide which listing route is open to you. If the
housing is tooled first and compliance is checked afterwards, a redesign is often the only
outcome. Confirm the compliance target before the mould is cut.
Retail packaging carries the model code, the electrical ratings and the compliance statement. If
artwork is approved late, either the carton changes or the label does. Approve the carton with the
golden sample.
The clock starts at the approved sample and the deposit, not at the first email. Buyers who
count from the enquiry date are usually the ones who feel a delay that never existed.
A hand-built sample proves an idea, not a line. We build the pre-production sample on the
production line with the production moulds, so what you approve is what you receive.
Our rule: nothing is released to mass production
until the pre-production sample is signed off, the carton artwork is signed off and the compliance route
is confirmed in writing. Three signatures, no exceptions.
Send your drawing or target spec and we will come back with a real quotation, a realistic lead time (within China) and an honest certification status.