OEM / ODM Welcome | Reply within 24h

Home / OEM & ODM

OEM & ODM

Bring a drawing or bring a target price — we have the tooling, the supply chain and the export paperwork to get it into a container.

Engagement models

Three ways to work with us

OEM — build to your drawing

You send the drawing, 3D file or a physical sample. We build tooling, produce a golden sample, and manufacture to your specification under your brand.

ODM — adapt our platform

Pick a platform from our catalog and we modify motor output, blade span, light engine, finish and control to hit your price point and market.

Private label

Your logo on the fixture, remote, manual and carton. We keep the tooling and the paperwork so reorders are fast.

Development process

From first email to shipped container

Timelines below assume an existing tooling platform. A brand-new housing or blade profile
adds 15–25 days for tooling and first-article approval.

Inquiry and technical review

Send target market, quantity, reference product or drawing. We confirm feasibility and flag certification implications within one business day.

Quotation

Unit price, MOQ, tooling cost, lead time (within China), packing details and payment terms.

Sample

Working sample in 7–15 days for existing tooling; 15–25 days extra if new tooling is needed.

Sample approval

You test the sample, we revise if needed. Golden sample is signed off for mass production.

Mass production

25–35 days after deposit and sample approval, depending on model mix and finishing.

Inspection and shipping

Final AQL inspection, photo report, third-party inspection on request, then FOB or EXW shipment.

OEM production layout

Indicative lead times (within China)

Sample: 7–15 days (existing tooling) | Mass production: 25–35 days |
New tooling: +15–25 days | Peak season (Aug–Oct) may add a week.

What can be customized

Every row below is negotiable inside a program

Item Options
Blade span and count 36″ / 42″ / 48″ / 52″ / 56″ / 60″ — 3, 4 or 5 blades.
Motor platform AC or DC brushless; power draw, speed steps and airflow tuned to target CFM.
Light engine Wattage, lumen output, CCT range, CRI and dimming protocol.
Finish Powder coat, painting, plating, wood grain print — matched to a sample or Pantone.
Control Pull chain, wall switch, RF remote, Wi-Fi or BLE module.
Smart ecosystem Tuya / Smart Life, Alexa, Google Home, or your own white-label app.
Packaging Plain export carton, retail color box, or display packaging with your artwork.
Documentation Manual, spec sheet, barcode/UPC, carton marks, compliance declarations.

To quote accurately

What to send us

You will get a faster, more accurate quotation if your first email includes these. If you
do not have all of them yet, send what you have — we will fill the gaps with you.

  • Target market and country
  • Quantity per model and total order
  • Reference sample, drawing or 3D file (for OEM)
  • Certification requirement (UL, ETL, Energy Star, FCC…)
  • Target retail or landed price, if you have one
  • Packaging and branding artwork, if ready

Intellectual property

Tooling built for your program is not used for other customers. We sign NDAs on
request, and we do not sell a customer’s proprietary design to anyone else.

Terms

Typical terms are 30% deposit with balance against copy of bill of lading.
FOB Zhongshan or EXW. Payment terms for repeat programs are negotiable.

Risk

Where OEM programmes usually go wrong

These are the four failure points we see most often on custom fan light programmes. Each one is
cheaper to prevent at the sample stage than to fix after mass production.

1. Certification decided after tooling

The motor, the driver and the insulation class decide which listing route is open to you. If the
housing is tooled first and compliance is checked afterwards, a redesign is often the only
outcome. Confirm the compliance target before the mould is cut.

2. Artwork approved after production

Retail packaging carries the model code, the electrical ratings and the compliance statement. If
artwork is approved late, either the carton changes or the label does. Approve the carton with the
golden sample.

3. Lead time (within China) measured from the wrong point

The clock starts at the approved sample and the deposit, not at the first email. Buyers who
count from the enquiry date are usually the ones who feel a delay that never existed.

4. A sample that is not the production article

A hand-built sample proves an idea, not a line. We build the pre-production sample on the
production line with the production moulds, so what you approve is what you receive.

Our rule: nothing is released to mass production
until the pre-production sample is signed off, the carton artwork is signed off and the compliance route
is confirmed in writing. Three signatures, no exceptions.

Ready to start a program?

Send your drawing or target spec and we will come back with a real quotation, a realistic lead time (within China) and an honest certification status.