GDtokinCOMMERCIAL LIGHTING
PRODUCT OPTIONS

Browse Lighting Tracks & Accessories by model

Compare the mounting, system and configuration before choosing a model.

COMPARE THE OPTIONS

Which lighting tracks & accessories configuration fits?

OptionWhen to consider itWhat to compare
Holder / trimAn installation or replaceable-lamp assemblyLamp format, opening, retaining method and included parts
Track railThe mechanical and electrical system layoutProfile, mounting, connectors, supply arrangement and compatibility
HousingA component or an assembled fittingWhether the source, driver, adaptor and wiring are included
SELECTION GUIDE

Lighting Tracks & Accessories checklist

01

Identify what is being ordered

Separate the luminaire, light source, driver, adaptor, rail and fixing items in the BOM.

02

Match the interfaces

Use drawings and system identification rather than appearance to check fit.

03

Keep components traceable

Reference the chosen configuration so purchasing and installation teams use the same parts list.

04

Approve a sample assembly

A representative assembly can reveal fit or access issues before a larger component order.

GDTOKIN · FOSHAN, CHINA

Source lighting components with a clear supply boundary

Our accessory selection includes GU10 / MR16 holder trims and track profiles. A component quotation needs a clear interface and supply boundary; it should not read as a complete-luminaire quotation.

At GDtokin, our lighting components selection starts with the product format and the installation it needs to fit. Identify the lamp holder or matched track system.

Included parts

List the component and any separately supplied hardware.

Assembly reference

Use a drawing or approved sample to define how the part fits the wider system.

About GDtokin →

sample discussion with our team

AC-C01 · Photo pending
WORKSHOP & FACILITY

The workshop behind the lighting components brief

Accessories: make the component boundary clear. Our accessory selection includes GU10 / MR16 holder trims and track profiles. A component quotation needs a clear interface and supply boundary; it should not read as a complete-luminaire quotation.

holder and trim display

AC-F01 · Photo pending

track-profile display

AC-F02 · Photo pending

component preparation area

AC-F03 · Photo pending

fixing and hardware storage

AC-F04 · Photo pending

rail-component storage

AC-F05 · Photo pending

interface sample bench

AC-F06 · Photo pending

parts packing area

AC-F07 · Photo pending

Production aisle

AC-F08
EQUIPMENT & ASSEMBLY

Lighting Components production equipment and workstations

Review the work areas and assembly interfaces relevant to the selected model. Photo positions marked “pending” will be completed with verified workshop images.

holder-trim assembly

AC-E01 · Photo pending

ring adjustment review

AC-E02 · Photo pending

rail-profile preparation

AC-E03 · Photo pending

connector fitting

AC-E04 · Photo pending

fixing-kit preparation

AC-E05 · Photo pending

Enclosed production equipment

AC-E06

interface sample review

AC-E07 · Photo pending

small-component packing

AC-E08 · Photo pending
FROM BRIEF TO SAMPLE

Define the lighting components package

01

Interface

Identify the lamp holder or matched track system.

02

Included parts

List the component and any separately supplied hardware.

03

Assembly reference

Use a drawing or approved sample to define how the part fits the wider system.

04

Sample sign-off

Agree the model, supply package and requested documentation before order approval.

CONFIGURATION & OEM DISCUSSION

Build the enquiry around your lighting components configuration

Use a drawing or approved sample to define how the part fits the wider system. Keep required features, optional configurations and separately supplied parts on distinct quotation lines.

  • Interface: Identify the lamp holder or matched track system.
  • Included parts: List the component and any separately supplied hardware.
  • Branding and packaging: discuss the requested artwork and supply scope with the selected model.
Discuss this configuration

configured sample with drawing and packaging artwork

AC-O01 · Photo pending
BEFORE BULK APPROVAL

Evidence for the chosen configuration

Technical record

Match the datasheet, drawing and stated options to the selected model.

Installation details

Review mounting, electrical arrangement, driver access and service space.

Market evidence

Request documentation for the exact model and destination.

Sample approval

Record the configuration and acceptance checks in the approval brief.

Discuss the documents your project needs
MODEL & MARKET DOCUMENTATION

Compliance documents for the selected lighting components

Match each document to the exact model and configuration. Document positions below are pending; they do not indicate that a certification has been obtained.

certificate with applicable model and scope

AC-D01 · Photo pending

test report and matching model reference

AC-D02 · Photo pending

completed customer application with publication permission

AC-P01 · Photo pending
APPLICATION & PROJECT REVIEW

Lighting Components in the project setting

Identify the lamp holder or matched track system. List the component and any separately supplied hardware.

Project details to be added

Location · application · selected configuration · approved customer outcome

Discuss the application brief →
SUPPLY SCOPE & PACKING

Keep the lighting components package clear

Use a drawing or approved sample to define how the part fits the wider system. The packing brief should identify the product, any separate components and the labels required for the destination.

individual protective packaging and included parts

AC-K01 · Photo pending

outer carton with dimensions and shipping marks

AC-K02 · Photo pending
BEFORE YOU REQUEST A QUOTE

Lighting Tracks & Accessories buying guide

Use the installation brief to make quotations easier to compare.

01

Identify what is being ordered

Separate the luminaire, light source, driver, adaptor, rail and fixing items in the BOM.

Include a drawing or installation photograph with the requirement. This gives the quotation a clear physical reference.

02

Match the interfaces

Use drawings and system identification rather than appearance to check fit.

Separate required features from optional configurations. Keep alternatives on separate quotation lines rather than treating them as interchangeable.

03

Keep components traceable

Reference the chosen configuration so purchasing and installation teams use the same parts list.

List the luminaire and any rail, driver, fixing or other component separately where applicable. Compare quotations against the same package.

04

Approve a sample assembly

A representative assembly can reveal fit or access issues before a larger component order.

Record the approved model, configuration, sample checks and requested destination-market documents before discussing the order.

BUYER QUESTIONS

Lighting Tracks & Accessories FAQ

Why are accessories separated from the lighting catalogue?

Their scope and selection criteria differ. A component can be essential to an installation without being a complete light.

Can any magnetic module fit these rails?

No universal compatibility is claimed. Confirm the rail profile, electrical arrangement, connectors and matched module.

Is model 58 a complete light?

That remains a supply-scope verification item. The catalogue should not label an empty housing as a complete luminaire.

What should be listed in an accessory quotation?

Use item identification, quantities, matched system or drawing, finish and an explicit list of included and excluded components.

TAKE THE NEXT STEP

Turn your shortlist into a clear requirement.

Start with a model or application. Review the configuration, required evidence and written terms before sample or order approval.

  1. Identify the product or lighting task.
  2. Review the appropriate configuration.
  3. Agree documents, samples and quotation scope.

By submitting, you agree that we may use these details to respond to this enquiry. Your shortlist is included with your message.

Shortlist 0